Available for ImportWheelset Assembly 2.7175.31.10.011.11 for Train Load Support and Direction
Manufacturer:OERVZ OJSC
Price:Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Description
Purpose of wheelsets
Wheelsets are designed to take the load from the wagon, the direction of its movement on the rail track and are a link in their interaction.
Main technical characteristics of wheelsets
- design speed 90 km/h
- by wheel design - wheelsets with solid-rolled wheels
- weight of wheelset with solid rolled wheels 1400 kg
- wheel diameter along the rolling circle 780 mm
-distance between the inner faces of the wheels 1440 mm
-dimension between the end faces of the inspection covers 2406 mm
-gear ratio of the wheelset gearbox 5,33
-nominal diameter of wheelset axle journals 110 mm
-type of axlebox bearings -roller bearings
-highest static load on the axle 140 kN (14 tonnes)
method of connection between wheelsets and bogie - spindle-type
Wheelsets are designed to take the load from the wagon, the direction of its movement on the rail track and are a link in their interaction.
Main technical characteristics of wheelsets
- design speed 90 km/h
- by wheel design - wheelsets with solid-rolled wheels
- weight of wheelset with solid rolled wheels 1400 kg
- wheel diameter along the rolling circle 780 mm
-distance between the inner faces of the wheels 1440 mm
-dimension between the end faces of the inspection covers 2406 mm
-gear ratio of the wheelset gearbox 5,33
-nominal diameter of wheelset axle journals 110 mm
-type of axlebox bearings -roller bearings
-highest static load on the axle 140 kN (14 tonnes)
method of connection between wheelsets and bogie - spindle-type
Specifications
Type of product according to PP RF 616
Component spare parts) of subway cars, not having independent groupings
Type
absent
Weight
1.46 t
Length
2402 mm
Width
785 mm
Height
785 mm
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In
Skif-RA Rail Bus Control and Diagnostics System
View DetailsPower Supply Unit (UP-1) VITYA 408124 004
View DetailsAnti-Skid Protection Control Unit VITYA 408112.010 (Under-Car Kit)
View DetailsSKIF-M Control and Safety Diagnostic System for Metro Cars
View DetailsTrain Onboard Device BUP-RA for Signal Reception and Control
View DetailsAdvanced Control System "SKIF-M20" for 2020-2024 Metro Cars
View DetailsDriver's Cabin Mask for Metro Car, Model RTGN.01.7752.90.01.000
View DetailsUniversal Safety Brake Block (BTBU)
View DetailsOver-Window Casing for Subway Cars, Model RTGN.01.7752.29.03.120
View DetailsRailway Wheels and Wheel Centers for Freight and Passenger Cars, Locomotives, and Metro Trains
View DetailsSkif-M20 Control, Safety, and Technical Diagnostics System
View DetailsFunctional Software for "SKIF-M" System, Model SKIF-M FPO
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions