Available for Import
Automated Traffic Control Complex "Strelka-Plus" for Accurate Speed Measurement
Manufacturer:
SPT LLC
Price:
Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Description
The complex is designed to measure the speed of vehicles (hereinafter - TC), measurement of current time values synchronised with the national time scale UTC(SU), measurement of current navigation parameters and determination of TC coordinates on their basis, measurement of distances to TCs, determination of location and trajectory of TCs in relation to road markings and photo-video fixation of traffic violations.
The complex is used on motorways, highways, in the street and road network.
The complex is used on motorways, highways, in the street and road network.
Specifications
Range of vehicle speed measurements when speed is measured by radar method
1...350
Range of vehicle speed measurements when measuring speed from video frames
0...350
Measurement range of vehicle speed when measuring speed in the controlled section
0...350
Limits of permissible absolute error of vehicle speed measurements when speed is measured by radar method
±1
Limits of permissible absolute error of vehicle speed measurements when measuring speed by video frames
±1
Discreteness of setting the speed limit thresholds
1
Tolerance limits of absolute error of assigning a time stamp to a video frame
±0.01
Limits of allowable absolute error of synchronization of the current time of complexes with the national time scale UTC(SU)
±1·10-6
Carrier frequency of RD module and 4D module transmitter
24.15
Minimum distance between the complexes when measuring the speed of vehicles travelling on the controlled road section
100 m
Length of the control area
20...600 m
Operation at ambient temperature
-60...85 °C
AC mains supply voltage 50±1 Hz
90...300 V
Note: All specifications are provided by the manufacturer and may be subject to change. Please contact us to confirm the latest specifications before placing your order.
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination)
Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In
Control Unit for RKP-CM Complex
View DetailsLED Signal Systems for Mast and Dwarf Railway Signals NCMR.676636.085TU
View DetailsControlled Road Sign (UDZ) for Traffic Management
View DetailsRailway Signal Mast Heads with LED Light Systems TU32 CS 2141-2009
View DetailsSpeed Control Device Block BUKS-08
View DetailsControl Signal Generation Unit RKP TU4D
View DetailsYellow LED Traffic Light T7.2 – Single Section, 300mm Aperture
View DetailsMagnetic Sensor DM-95N for Wheel Detection
View DetailsRelay Object Controller Management Module Kit OK-EL Type 3
View DetailsTraffic Light DS7-25 (T.1.II) for Vehicle and Pedestrian Control
View DetailsTraffic Controller DK2 Model CHT468219006001
View DetailsLocomotive Indication Block BIL-IP-01 36905-210-00 for BLOCK-M System
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions